Updated 03/15/2010 07:05 AM
FOLLOW US ON TWITTER! www.twitter.com/News10_Traffic
ONONDAGA COUNTY
Continuous Projects - Onondaga County
I-81 NORTHBOUND MAINLINE CLOSURE FROM I-690 WEST RAMP TO COURT STREET (Building Collapse Issue)
Pearl Stret & Butternut Street on ramps are closed to 81 north.
*Bridge Replacement Operations, now* I-81 Northbound and Southbound: Left lane and right shoulder closed in both directions, approaching and passing under the Bartell Road Bridge, Brewerton. Additional lane and ramp closures are possible on a daily basis as needed.
*I-690 Retaining Wall Rehabilitation Project* I-690 Westbound: Exit 11 (West Street) will be closed to all traffic. I-690 Westbound Exit 11 (West Street) Detour: Proceed I- 690 west to Exit 10 (Geddes Street), turn left on Geddes Street to I-690 east ramp, proceed on I-690 east to Exit 11 (West Street).
*(Winter) Seasonal Speed Limit* Route 370 Eastbound and Westbound (Onondaga Lake Parkway Section): Seasonal speed limit is in effect now through April 1, 2010, reduced "from" 55 m.p.h. "to" 45 m.p.h.
Oswego County
*I-81 Bridge Repair Operations*
I-81 Southbound Mainline: Right lane closed approaching and crossing over the bridge over the Barge Canal/Oneida Lake Outlet, reducing travel to 2 lanes until further notice.
I-81 Northbound: Left lane closure which has been in place under the Bartell Road bridge replacement project has been extended to the area crossing the bridge over the Oneida Lake Outlet, reducing travel to 2 lanes until further notice.
CAYUGA
US 20 major road construction on US 20 in both directions from Route 38A Junction East Genesee Street to Auburn East City Line. Until further notice.
JEFFERSON COUNTY
I-81 construction work on I-81 in both directions from Exit 45; NY 3 to Exit 45; NY 3. This is part of the I-81/Arsenal St. reconstruction project. Motorists may encounter occasional daily lane closures with a reduced speed of 45 MPH as the contractor finishes up some minor items of work. Now until further notice.
Construction work on I-81 in both directions from Massey Street I-81 to Exit 46 - Route 12F. Starting on 04/07/08 07:07 AM until further notice. This is part of the I-81/Arsenal St. reconstruction project. Motorists may encounter daily lane closures with a reduced speed of 45 MPH.
81 construction work on I-81 in both directions at Exit 49 - Route 411. Until further notice. There may be shoulder closures during the day.